Home
Contact Details
The Vinyl Kitchen
Solid Timber Kitchen
Joyce Kitchen make over
Do-It-Yourself

 


Before and after – a Joyce Kitchen make over
Building a new kitchen or renovating an old one is an exciting, rewarding and sometimes anxious experience.  

At Joyce Kitchens we aim to design, manufacture and install a quality kitchen with a minimum of fuss. (A design and manufacture only service is also available for those who wish to install themselves).

The lead time in manufacturing a kitchen is typically around six to eight weeks from the date of signing your contract. More time is required if you opt for granite, stone or other solid material bench-tops (these are not supplied by Joyce Kitchens and cannot be manufactured until the cabinets have been installed). Installation of the kitchen itself takes one to two days.

Before

After

Typical Stages in Installing a Laminate/Melamine Kitchen

  • Day one (early morning) - Ripout and plumbing / electrical preparation
  • Day one (mid morning) - Kitchen installation begins
  • Day two – Installation completed
  • Day three – Plumbing / electrical re-connection